|
General Building Information Size: 44,194 sq. ft.
Construction cost: $ 7,782,000 Total estimated cost: $12,190,550 (Including furniture, equipment audio-visual equipment and professional services)
Completion
Substantial completion: June 1, 2010 Final completion: July 1, 2010
What's Inside
Nursing Education
Science
Other
Sustainable Features
-
Geothermal closed-loop heat pump HVAC
-
Sky lights with integrated controls to reduce artificial lighting during daytime
-
Room motion sensors to turn off and on room lighting
-
Dual flush toilets Low water flow faucets
-
Fluorescent lighting with energy efficient T-8 lamps
-
Use of architectural features to provide
-
Indirect lighting into interior spaces
-
Double glazed Low E Windows
-
Roof insulated to R-38
-
Wall insulated to R-19
-
Recyclable carpeting
-
Construction waste management
-
Use of renewable or recycled materials
-
Energy management system
-
Commissioning of mechanical systems
-
Bicycle racks
|
Naming Rights
Naming rights for the Health-Science Education Center are available at a range of donation levels. For more information, click on the Naming Rights and Donation Opportunities menu item at the left.

Health-Science Education Center lab area 8-3-2010.

Formal groundbreaking ceremonies were conducted May 14, 2009 for the Health-Science Career Education Center. Construction actually began in March 2009. The first classes in the building are scheduled for the 2010 fall semester.
More photos of the Health Science Education Center.
KHAS-TV Groundbreaking story
KOLN-KGIN TV Groundbreaking story
Architect
Wilkins Hinrichs Stober Architects, L.L.C., Kearney
Landscape architect
Big Muddy Workshop, Omaha
Structural engineer
Performance Engineering, Omaha
Mechanical-electrical engineer
KRS Engineering, Omaha
Building contractor
Hausmann Construction, Lincoln
 |